Latest News

News: Case Studies

  • WESTFORD, MA WATER DEPARTMENT IN SITU REDEVELOPMENT

    WESTFORD, MA WATER DEPARTMENT IN SITU REDEVELOPMENT

    Maher Services Inc, of North Reading, Massachusetts was contracted by the Westford Water Department to undertake in Situ redevelopment of Westford’s Nutting Road # 2 Gravel Packed Well.

  • BENCH TOP STUDY

    BENCH TOP STUDY

    A simple bench-top study was conducted to observe the visual effectiveness of various enhanced treatment cleaning products used in the drinking water industry, for the cleaning of internal storage tanks and for well redevelopment, where iron, manganese and/or biofilm are the major components of the fouling.

  • KMCI TANK CLEANING, PLYMOUTH, WI

    KMCI TANK CLEANING, PLYMOUTH, WI

    Water Well Solutions, Panton McLeod’s Wisconsin Partner, won a competitive bid contract for the enhanced cleaning of a 200,000 gallon, below ground water reservoir, at the Kettle Moraine Correctional Institution, Plymouth, Wisconsin.

  • WESTFIELD, IOWA TANK CLEANING DEMONSTRATION PROJECT

    WESTFIELD, IOWA TANK CLEANING DEMONSTRATION PROJECT

    Panton McLeod – Americas supervised the tank cleaning of a 40,000 gallon, steel, ground level storage tank in Westfield, Iowa, conducted by Maguire Iron, Co.

  • CHATHAM, MA. IN-SITU REDEVELOPMENT

    CHATHAM, MA. IN-SITU REDEVELOPMENT

    Maher Services, Inc. of North Reading, Massachusetts was contracted to conduct in-situ redevelopment of a high yielding well in Chatham, MA., during the fall of 2012 (Chatham # 6).

  • LITTLETON, MA WATER DEPARTMENT

    LITTLETON, MA WATER DEPARTMENT

    The Littleton Massachusetts Water Department has conducted numerous redevelopments of their Spectacle Pond # 5 Well over the past 15 years. Comparison of redevelopment methods examined.

Copyright 2016 Panton McLeod. All rights reserved. Panton McLeod Logo