WESTFORD, MA WATER DEPARTMENT IN SITU REDEVELOPMENT
01 June 2016
Maher Services Inc, of North Reading, Massachusetts was contracted by the Westford Water Department to undertake in Situ redevelopment of Westford’s Nutting Road # 2 Gravel Packed Well.
-
BENCH TOP STUDY
05 April 2016
A simple bench-top study was conducted to observe the visual effectiveness of various enhanced treatment cleaning products used in the drinking water industry, for the cleaning of internal storage tanks and for well redevelopment, where iron, manganese and/or biofilm are the major components of the fouling.
-
KMCI TANK CLEANING, PLYMOUTH, WI
10 March 2016
Water Well Solutions, Panton McLeod’s Wisconsin Partner, won a competitive bid contract for the enhanced cleaning of a 200,000 gallon, below ground water reservoir, at the Kettle Moraine Correctional Institution, Plymouth, Wisconsin.
-
-
WESTFIELD, IOWA TANK CLEANING DEMONSTRATION PROJECT
29 September 2015
Panton McLeod – Americas supervised the tank cleaning of a 40,000 gallon, steel, ground level storage tank in Westfield, Iowa, conducted by Maguire Iron, Co.
-
CHATHAM, MA. IN-SITU REDEVELOPMENT
18 August 2015
Maher Services, Inc. of North Reading, Massachusetts was contracted to conduct in-situ redevelopment of a high yielding well in Chatham, MA., during the fall of 2012 (Chatham # 6).
-
LITTLETON, MA WATER DEPARTMENT
15 June 2015
The Littleton Massachusetts Water Department has conducted numerous redevelopments of their Spectacle Pond # 5 Well over the past 15 years. Comparison of redevelopment methods examined.